pectra-devnet-3 specs

:mega: Devnet-3 targets launch at 11th of Sep 2024 12:31:00UTC and shut down 18th Oct 2024 13:00:00 UTC.

EIP List for pectra-devnet-3

The list below links the specific commit versions of the EIPs included in devnet-3.

Spec versions required

Consensus Specs - v1.5.0-alpha.4 :heavy_check_mark:
Execution Spec Tests - pectra-devnet-3@v1.5.0 :heavy_check_mark:

Beacon API

Execution EIPs

Engine API

Builder Spec
PR-101 - add initial electra spec - Open :exclamation:

Spec changes for the previous devnet: https://notes.ethereum.org/@ethpandaops/pectra-devnet-2